Home PROJECTS Northwest
Print  pdf  email

Northwest

Project NameCompany LogoPracticeRainfall Managed
Dickinson County CourthouseCompany LogoRain Gardens and Bioretention Cells

The first 1.25" of stormwater runoff from the new concrete parking lot is cooled filtered and treated. The LID practices have a total of 4,940 Cubic Feet of Storage Volume.

Urban Street, OkobojiCompany Logo

The first 1.25" of storm water runoff from the site is cooled filtered and treated. The Low Impact Development practices have a total of 4,980 Cubic Feet of storage volume available.

Okoboji Pactice ComboSoil Quality Restoration, Native Landscaping & Turf, Roadside Plantings

 

Per City Ordinance the first 1.25 inches of runoff from all impervius surfaces required 421 cubic feet be stored. Actual storage provided by the design was 455 cubic feet.

 

Okoboji Rain GardenRain Gardens and Bioretention Cells

 

Per City Ordinance the first 1.25 inches of runoff from all impervius surfaces required 303 cubic feet be stored. Actual storage provided by the design was 352 cubic feet.